Project Planning in Scaffcalc

Plan every detail. Deliver every piece.

Turn any blueprint into a precise 3D scaffold plan with automated material lists. One click from design to delivery — no spreadsheets, no guesswork, no overordering.

456 projects with 5/5 stars, 2026

Trusted by +140 scaffolding companies across Europe

XervonNorisolMaster StillasBeerenbergEDS SteigerbouwKPS SteigerbouwSTE-BA GerüstbauMiratoolsKymsolKaeferXervonNorisolMaster StillasBeerenbergEDS SteigerbouwKPS SteigerbouwSTE-BA GerüstbauMiratoolsKymsolKaefer
01

Sketch the site, or import it

Upload a PDF floor plan, drop in an IFC file, or trace the building outline directly on the Scaffcalc canvas. The background scales and locks into position automatically: so your 3D scaffold is anchored to the real structure from the first bay.

02

Box mode for speed. Components for precision.

Block out full scaffolding coverage bay by bay with Quick Box Mode: the complete picture in seconds. Switch to component-by-component when you need to nail every standard, ledger, and tie. Two modes, one model. Use both as the project develops.

03

Saved, shared, and ready to build.

Every project lives in your Scaffcalc folder structure: no version chaos, no emailed PDFs. Share one link with your crew and your client. They see the same 3D model, drop comments directly in the 3D space, and the material list is already generated from whatever you've built.

Before, there was a lot of guessing everywhere. Now I walk through the entire project in 3D with the crew, from start to finish.

Chriztoffer Marcusson

Project Support at XERVON

Project Planning

The material list that matches the build.

Generate automatic bills of materials directly from your 3D scaffold model. Filter by project stage, export to Excel, and make sure the lorry carries exactly what the site needs — nothing more, nothing less.

The material list that
matches the build.The material list that
matches the build.The material list that
matches the build.

From guessing to planning — scaffolders are switching to Scaffcalc

±2%

Material accuracy

Precise BOM from the 3D model eliminates overordering

140+

Companies

Scaffolding contractors across Europe trust Scaffcalc

50%

Less time planning

Cut project planning time in half compared to pen and paper

Compatible with these scaffolding systems

Layher AllroundLayher SpeedyScafPERI UP FlexPERI UP EasyAT-PAC MetricAT-PAC ImperialHaki UniversalScafom-Rux RingscaffMJ Gerüst CombiMJ Gerüst OptimaPlettac Perfect ConturPlettac SL70/SL100Solideq RamscaffSolideq AluscaffPlus8Super 9AlustarStepUp OctoLayher AllroundLayher SpeedyScafPERI UP FlexPERI UP EasyAT-PAC MetricAT-PAC ImperialHaki UniversalScafom-Rux RingscaffMJ Gerüst CombiMJ Gerüst OptimaPlettac Perfect ConturPlettac SL70/SL100Solideq RamscaffSolideq AluscaffPlus8Super 9AlustarStepUp Octo

Book your Scaffcalc demo.

Takes about two minutes. Start with your work email.

FAQ

Frequently Asked Questions

Traditional CAD software like AutoCAD or Revit is built for general construction. It requires months of training, expensive licenses, and produces no scaffolding-specific output. Scaffcalc is purpose-built for scaffolding professionals. Design your scaffold in 3D with drag-and-drop, generate precise material lists with one click, and run structural load calculations directly from your model. The result isn't just faster, it's safer. Every structure can be verified before anything goes up. Share your project as an interactive 3D link that clients and crew can open on phone, tablet, or desktop. No installation needed.